×
Deal Details
How to order
2. Log in or register
3. Add the product to your cart
4. Enter your shipping details
5. Make the final payment
Product Details
Lifetime 44″ Portable Basketball System:
Enjoy the game at your level without the use of tools
Lifetime portable basketball hoop has a telescoping pole that can adjust the rim height from 7.5′ to 10′ in 6″ increments
The Impact® Backboard is molded of high-density polyethylene
Graphics on this adjustable basketball hoop are screen-printed with UV-protected inks for superior color and protection against the elements
The 3-piece round steel pole is protected with a powder-coated, weather-resistant finish
Lifetime portable basketball hoop is supported by a heavy-duty portable base
Simply fill it with sand or water and start playing
Classic rim features a 5/8″ solid-steel ring supported by 1/2″ braces and an all-weather nylon net